Logistics centre — Carlsberg
- Location
- Blagoevgrad, Bulgaria
- Period
- 2010
- Client
- D-r Speed AD
- Contractor
- HMC
Steel structure for a warehouse and logistics base at the brewery.
Design, fabrication and erection of the steel structure for a logistics centre with large storage volumes.
Let's build together